Increased Pass Forward Flow
Waste Water Terminal Pump Station - North Devon
We were tasked by our client to scope and design an upgraded pump solution to achieve a higher pass forward flow. Our scope included:
On site investigation followed by electrical design.
Modification to existing MCC starter section.
Installation and integration of a new 132Kw VSD.
Installation of upgraded SWA cable and containment.
Adjustments to existing PLC software to incorporate the new VSD and flow control.
On site commissioning and close out documentation.