Increased Pass Forward Flow

Waste Water Terminal Pump Station - North Devon

We were tasked by our client to scope and design an upgraded pump solution to achieve a higher pass forward flow. Our scope included:

  • On site investigation followed by electrical design.

  • Modification to existing MCC starter section.

  • Installation and integration of a new 132Kw VSD.

  • Installation of upgraded SWA cable and containment.

  • Adjustments to existing PLC software to incorporate the new VSD and flow control.

  • On site commissioning and close out documentation.