Electrical Installation & Commissioning

Waste Water Treatment Works, Devon

This project required an overhaul of the existing site electrical installation to comply with the Principal Designers process upgrades. This included installation of new Storm Tanks, Anaerobic Tank, Aerated SAS Balance Tank and Sludge Thickening Tank. Work undertaken included:

  • Electrical design in line with Principal Designers P&ID.

  • Electrical procurement and installation of cable containment and cabling.

  • Installation and commissioning of pumps, mixers, flow meters, level monitoring and backup control.

  • Gland and connection of all SWA cables back to the newly installed MCC.

  • Kiosk building services.

  • PLC software modifications.

  • Commissioning documentation and Client training.

Contact us

Let’s discuss how we can help with your project. Send a message using the form, email info@dtecpro.co.uk, or call us on 01237 751440.

Previous
Previous

Power Supply Upgrade - Waste Water Treatment Works - West Devon

Next
Next

Replacement Flow Monitoring - Waste Water Treatment Works - Mid Devon